Project Description
Elektrárna KOLÍN, Tovární 21, 280 63 KOLÍN, Nowadays: Dalkia Kolín, a.s.
Parameters: 100t/h, 4,3MPa, 440°C
as follows:
PS01 – Fuel feeding system
PS02 – Boiler
PS03 – Forced boiler draft
PS04 – Connecting pipes
Materials: P235GH, P265GH, 13CrMo4-5, 16Mo3, 14MoV63
Weight of installation: 1050 tons
Percentage of participation in project implementation: 100%
Manpower on site: Maximum 80, Average 40