Project Description
GE, SA, Elektrownia Belchatow, Poland
Parameters: 380MWe/1100tph, 18,7MPa, 550C
Assembly and repair of: membrane walls, burners, pipings, Eco and Superheater bendings.
Materials: 13CrMo4 (1.7335), 10CrMo910 (1.7380), 15Mo3 (1.5415), 15HM, St35
Weight of installation: 2200 t. Total No. of pressure welds 66500.
Percentage of participation in project implementation: 50% of pressure parts
Manpower on site: Maximum 230, Average 180
Steinmueller Instandsetzung Kraftwerke, Peitz, Germany