Project Description
TYNAGH ENERGY LIMITED, Ireland
Piping installation in 400MW Combined Cycle Power Plant
Parameters: HP line 13,69MPa
Installation of connecting pipe for steam-gas cycle for following media:
– Steam system: HP, HR, CR, IP, LP
– Feed water HP – IP,
– Greasing oil station
– System of de-mineralized water
– Condensate water system
– Output section from steam turbine into collector and interconnecting system for exhaust fumes
Materials: X10CrMoVNb9-1 (P 91), 13CrMo4-5, 16Mo3
Weight of installation: 800 tons.
Percentage of participation in project implementation: 30%
Manpower on site: Maximum 90, Average 85
GAMA Power Systems Inc. North W2ood Park, Santry Dublin 9 Ireland