Piping installation in 400MW Combined Cycle Power Plant, Tynagh, Ireland

Piping installation in 400MW Combined Cycle Power Plant, Tynagh, Ireland2019-03-14T13:00:13+01:00

Project Description

TYNAGH ENERGY LIMITED, Ireland

Piping installation in 400MW Combined Cycle Power Plant

Parameters: HP line 13,69MPa

Installation of connecting pipe for steam-gas cycle for following media:

– Steam system: HP, HR, CR, IP, LP

– Feed water HP – IP,

– Greasing oil station

– System of de-mineralized water

– Condensate water system

– Output section from steam turbine into collector and interconnecting system for exhaust fumes

Materials: X10CrMoVNb9-1 (P 91), 13CrMo4-5, 16Mo3

Weight of installation: 800 tons.

Percentage of participation in project implementation: 30%

Manpower on site: Maximum 90, Average 85